Résumé

Oliver Curtis

Project manager and civil engineer.

Practitioner of project and portfolio delivery, asset management, and digital tooling to drive the build-out and modernization of multi-generational utility assets.

01

Experience

1 / 9
01

Experience

1 / 9

Project manager in the Nuclear Asset Sustainability Projects (NASP) organization. Delivering electrical, I&C, and digital projects across TVA's 7-unit nuclear power generation fleet.

  • Project delivery

    Manage scope, schedule, cost, quality, risk, and safety from initiation through closure under the SPP-34 and SPP-19 series frameworks.

  • Portfolio ownership

    Serve as single point of contact for electrical and I&C modernization and asset sustainability projects (>$35M portfolio)

  • Funding & approvals

    Develop project scopes, cost estimates, and funding authorization packages for Project Approval Board (PAB) review; presented projects to TVA NPG executives for approval.

  • Cross-functional leadership

    Directed multi-discipline teams spanning design & system engineering, procurement/supply chain, site maintenance, outage management, and external vendors. Lead high-performance project delivery through collaboration and influence across organizations without direct reporting authority.

Explore key projects03
01

Key projects

2 / 9

Key projects

  1. CRDM & RPI Cables Replacement

    High complexity, high consequence of failure replacement of cables and connectors for Control Rod Drive Mechanism (CRDM) and Rod Position Indicator (RPI) systems across TVA's PWR fleet.

  2. SQN Emergency Diesel Generators - SBSR Exciter Automatic Voltage Regulators Replacement

    Replacement of critical, aging safety related I&C components during accelerated 7-day diesel generator outages

  3. Multi-site Heat Trace Replacement Program

    High ROI replacement and expansion of heat trace systems for critical safety related instrument sense lines across TVA's 4-unit PWR fleet for winter resilience and readiness.

01

Experience

3 / 9

"Seller-doer" consulting engineer for water and wastewater utilities in Tennessee and Georgia. Engaged in the execution of treatment, conveyance, distribution/collection system, and regulatory/digital projects.

  • Project delivery

    Managed scope, schedule, budget, quality, and risk performance of technical SMEs and digital delivery staff across multi-disciplinary design projects.

  • Pursuits & scoping

    Developed engineering scopes, LOEs, and contract pricing for sales pursuits (WWTP & WTP expansions, high service/finished water pump stations, raw water intakes, financial and capital management services)

  • Project controls

    Managed monthly project financials, including invoicing & progress reporting, ETC/EAC budget forecasting, operations management project reviews, and client progress reporting.

  • Engineering

    Utilized hydraulic modeling tools to size and evaluate process piping and pumping equipment for water and wastewater facilities. Mentored junior staff on process mechanical and hydraulic design processes.

  • Financial modelling

    Developed lifecycle cost, economic analysis, financing, and cash flow models for capital projects and programs between $200M-$3B.

  • Utility advisory

    Advanced Jacobs’ utility financial management & advisory practice in Tennessee; developed capital plans, funding strategies, rate studies, and revenue sufficiency recommendations in collaboration with utility managers and directors.

Explore key projects06
01

Key projects

4 / 9

Key projects

  1. Cleveland Utilities Authority - Capital Program Staffing Analysis

    Developed custom tool to perform engineering department staffing gap analysis using FY26 capital plan.

  2. Eastside Utility District – 48 MGD RWPS & WTP Expansion PER

    Managed remote discipline specialist teams (surge analysis, architectural, HVAC/mechanical, structural, electrical, cost estimating) in preparing condition assessment, alternatives analysis, and final recommendations.

  3. Eastside Utility District – 36 MGD Finished Water PS & 2 MG Clearwell

    Served as Design Manager and Assistant PM under Sr. Process Engineer and Project Manager. Acted as liaison between technical discipline leads/SMEs, CAD/digital delivery leads, and project management team.

  4. Eastside Utility District – Lead and Copper Rule Implementation

    Served as Data Management & Integration Technical Lead in developing automated, ArcGIS Online-based system of record for service lines in the district.

  5. Nashville Metro Water/Carollo – Omohundro WTP Process Improvements

    Developed lifecycle cost, financing, construction escalation, and cash flow models for Nashville Metro Water’s $1.4B Omohundro Process Improvements project.

  6. City of Chattanooga - Disconnect Program Conceptual Study

    Developed conceptual design alternatives analysis (scope, schedule, budget) for major Regional Customer/Interjurisdictional Agreement disconnection program for the City of Chattanooga.

01

Experience

5 / 9

Served as technical lead & product development manager. Charted the technical roadmap for a highway ROW asset condition assessment startup.

  • Sensor systems

    Led the design, procurement, and systems integration of vehicle-mounted LiDAR, GNSS/IMU, and imagery sensors with on-board edge computing and computer vision inference hardware.

  • Platform architecture

    Led the development of internal data processing, condition assessment, and work order management platform, built on Django, PostgresSQL/PostGIS, GeoServer, MapBox, Metabase etc. to avoid ESRI vendor lock-in.

  • Team leadership

    Managed 2-4 software developers, image annotation staff, and other technical staff in execution of product development scopes.

  • Client applications

    Built client-facing web mapping applications on ArcGIS Online, with PowerBI reporting integration.

  • AI & model deployment

    Developed, trained, tested, and managed deployment of in-house computer vision AI/ML models.

01

Experience

6 / 9
  • Engineering Design

    Prepared preliminary and detailed design submittals for culinary water, secondary water, sanitary sewer, and drainage projects in Civil3D.

  • Utility Deconfliction

    Coordinated with local governments, utilities, and agencies to identify existing and proposed utility conflicts.

  • Right-of-Way

    Developed ROW trenchless crossing & encroachment design drawings and permit application packages for 3rd party agencies, including UPRR, UTA, UDOT, etc.

  • Specifications & Cost Estimating

    Prepared project specification manuals, quantity take-offs, and cost estimates.

Explore key projects06
01

Key projects

7 / 9

Key projects

  1. Ogden City - Exchange Rd/Jefferson Ave Storm Drain & Sewer Improvements

    Developed 30% and 90% design drawings for ~1 mile of 8, 10, and 12-inch sanitary sewer in downtown Ogden, UT, including a railroad crossing, open cut canal crossing, and custom sewer overflow box structure.

  2. North Ogden City – Public Works Standard Drawings

    Digitized and updated North Ogden City’s standard drawings and details from AutoCAD 2002 format.

  3. Ivory Homes – Zone 4 Culinary Transmission Line

    Re-designed 20”, 24”, & 30” culinary water transmission lines from DIP to HDPE; developed 60% and 90% design drawing re-submittals.

  4. WCG - Herriman Main Street Widening

    Designed pressure irrigation, gravity irrigation, and culinary water line alignments and profiles along widened roadway corridor.

  5. City of Farmington - Burke Lane Waterline Improvements

    Developed preliminary alignment alternatives for 16” culinary water transmission line loop under I-15 and UPRR/UTA rail lines.

  6. Seven Mile Ranch Subdivision Phases 1 & 2

    Re-designed Phase 1 and Phase 2 final plats and construction drawings for 200+ unit high-end residential subdivision along Bear Lake in St. Charles, Idaho under supervision of Sr. Engineer & Surveyor of Record.

01

Experience

8 / 9

Client-facing capital program management and project controls lead. Core member of a lean, high-performance program management office for the City of Chattanooga's $1B+ consent decree program.

  • Capital Portfolio Management

    Developed and managed $1B+ client capital improvement plan; optimized interceptor sewer system capital budget for the City of Chattanooga, TN.

  • Project Financing

    Managed over $300M in Clean Water State Revolving Fund loans from procurement through close-out/re-payment. Led successful schedule extension and reimbursement of $200M in at-risk, behind-schedule legacy SRF loans.

  • Design and Construction Oversight

    Served as program-level construction and engineering management layer between engineering consultants, contractors, City PM staff, and Wastewater management staff during the execution of 8-84” CIP pipeline rehab, sewer lift station, tank/equalization basin, and WWTP projects.

  • Tool Development

    Led the development of program management systems and tools, including in-house project management, financial modeling, and procurement platforms. Worked directly with the Program Manager to establish CD Program performance metrics and KPIs.

  • Cost and Schedule Management

    Reviewed monthly engineering consultant invoices, contractor pay applications, near-term and project schedule submittals for over 20 concurrent sewer master planning, detailed design, and construction projects.

  • CPM Scheduling

    Built and maintained project- & program-level critical path method schedules in Primavera P6

01

Experience

9 / 9

Hybrid field operations, quality control, and project controls. Multi-disciplinary project support across heavy civil, land development, and utilities projects.

  • Project controls

    Assembled quantity take-offs, cost estimates, and bid proposals. Processed union and non-union payrolls for over 30 craft trade employees. Assisted PMs in project cost accounting and reporting; assisted OMs in assembling work packages.

  • Project scheduling

    Developed critical path method construction schedules.

  • Field quality control

    Performed field surveying & layout with Topcon and Trimble GPS systems. Led field quality control, surveying, and site layout activities.

  • Craft Labor Support

    Supervised trade employees on utility and site development projects. Provided administrative support to site superintendents and crew foremen. Operated heavy civil construction equipment, including backhoes, excavators, compactors, etc.

02

Education & credentials

Education & credentials
Brigham Young University

Bachelor of Science, Civil Engineering

Brigham Young University
2018-2024
  • Engineer-in-Training
    State of Tennessee · active
  • Project Management Professional (PMP)
    PMI · in progress
03

Competencies

Competency areas
Self-rated, 1–5
Competency areas, rated 1 to 5PROJECT MANAGEMENTASSET MANAGEMENTSOFTWARE & DIGITALHYDRAULICS & PROCESS MODELLINGFINANCIAL MODELLING

Core

rated 5 · where I'm strongest

  • Project management5 / 5
  • Financial modelling5 / 5

Developing

under 5 · actively building

  • Asset management3 / 5
  • Software & digital4 / 5
  • Hydraulics & process modelling3 / 5
04

Tools

Tools & technical practice

Engineering

  • Autodesk Civil3D
  • Autodesk Revit
  • ESRI ArcGIS Pro
  • QGIS
  • AFT Fathom
  • AFT Impulse
  • Bentley WaterGEMS
  • Bentey OpenRoads
  • Aquaveo WMS/SMS
  • HEC-RAS
  • HEC-HMS

Project Management

  • Primavera P6
  • Microsoft Project
  • BlueBeam Revu
  • IBM Maximo

Software & Digital

  • Python for geospatial and data work: pandas, geopandas, shapely, numpy, scipy, matplotlib, laspy
  • PostgreSQL + PostGIS; MSSQL; psycopg2
  • Computer vision: OpenCV and YOLO-family detectors
  • OCR pipelines (Tesseract) for digitizing legacy engineering reports into structured metadata
  • Next.js and React
  • AWS S3 and boto3; Docker; Git; JupyterLab
Scroll to exploreTennessee Valley Authority · Overview
01 / 12